Thousands of Installations Worldwide

0+
Installations Worldwide
0+
Square Feet of Docks
0MW
Floating Solar in Development
0+
Years Experience

We are Hazelett Marine

Founded in 1989, Hazelett Marine is an internationally recognized brand name for premium marinas and advanced floating solutions. With the industry’s widest pontoon product range and our network of marina experts around the world, Hazelett Marine can match different customer needs from a custom-made floating structure to a world-class marina.

Hazelett Marine Projects

Hazelett Marine Group has thousands of installations in more than 50 countries. Our projects include some of the most challenging ones, including 6 Marinas at Deira Island in Dubai, Grand Harbour Marina on the archaeologically sensitive island of Malta, the luxury Porto Carras Marina in Greece, the Anchor Marina in the Palm Jumeirah in Dubai.

Latest news

Latest Projects

MADE IN USA – STRONGEST & MOST VERSATILE – 3rd PARTY TESTED

According to tests monitored by SouthWest Ocean Services (SWOS), one single 8000 series Hazelett Marine Engineered Elastomer can withstand a force of drag greater than 13kN, elongate over 200% of its length and retract back to original length.

Brooklyn Bridge Marina

Location: Brooklyn Bridge Marina, Brooklyn, NY
Hazelett Marine is providing elastic mooring systems for Brooklyn Bridge Marina. Brooklyn Bridge Marina, New York City’s first new marina in 50 years, offers unparalleled water access to New Yorkers and boating enthusiasts from around the globe.

Mayotte Terminal

Location: Mayotte, Indian Ocean
Hazelett Marine has provided elastic mooring systems, design & engineering for a large floating concrete terminal in Mayotte.

Floating Solar – Sea

Location: Maldives
Hazelett Marine has provided elastic mooring systems for floating solar platforms for the TAJ project in the Maldives – a utility scale near shore floating solar project with 3m waves and challenging conditions. More exciting installations to come!

Salinas Yacht Club

Location: Salinas, Ecuador
Hazelett Marine provided Elastic Moorings, design & engineering, and installation support to Salinas Yacht Club for their installation of floating concrete docks at the Salinas Yacht Club for large yachts.

Fish Hook Marina

Location: Golfito, Costa Rica
Hazelett Marine provided Elastic Moorings, design & engineering to Fish Hook Marina for their installation of floating docks at the Fish Hook Marina.

Lough Derg Marina

Location: Killaloe, Ireland
Lough Derg Marina in Killaloe, Co Clare, Ireland has more than 500m of water frontage and panoramic views over the lake and adjoining countryside. Killaloe has become an extremely popular residential location in the region due to its beauty. Additional berths at Lough Derg Marina were contracted to help meet demand.

Coors Floating Solar Pilot Project

Location: Golden, CO
Hazelett Marine installed a floating solar pilot project at the Coors facility in Golden, CO. This pilot array will be in for a calendar year to gauge the array’s ability to handle the high winds, waves, and snow loads.

Bow & Arrow R&D – FPV Mooring Design

Location: Japan
Hazelett, in collaboration with Ciel et Terre, pioneered “Bow and Arrow” mooring systems. The Bow and Arrow anchoring system allows to manage the array movement area and to afford a slight load increase in the mooring lines. In addition to the cost improvement, the system provides technical advantages such as balancing the load more efficiently.
Learn more: https://ciel-et-terre.net/bow-and-arrow-the-anchoring-system-bringing-more-elasticity-in-the-mooring-lines/

Testimonials

“Hazelett Marine was easy to work with, delivery was fast and product was cheaper than competitive products. While our dock was inland, it survived Hurricane Florence because of Hazelett elastics. We will definitely use them on our next project.”

Steven Bailey, NC Wildlife Resources Commission

“Marshall Marine’s three docks were constructed with a piling support system customary to this area (South Dartmouth, MA), however, ongoing maintenance costs and service disruptions were causing us problems.

Steve Gomes came up with a cost-saving solution using a Hazelett anchoring system instead of replacing expensive pilings sheared by ice flow that were in otherwise good condition. We proceeded cautiously, installing just one dock system at first, but after two years of zero breakage or maintenance, all of our docks are now secured with a Hazelett system.”

Billy Pires, Marshall Marine Services

“I’m moored in Groton CT and when Irene came through I went down to look at how everyone that was still in the mooring field was doing (I hauled out for the storm).

We had one boat on a Helix/Hazelett combination and although the wind wasn’t too bad the waves were high, short and steep. The thing I noticed was when this boat hit the end of its travel with a wave there was no whipping motion from the roller furler foil on the head stay. The other boats around it had a distinct whipping motion as they came tight on their chains. So the elastic rode was doing its job and the helix is about 12 feet into the bottom so dragging isn’t an issue.

Not a cheap solution but a lot of peace of mind.”

Boat Owner

“I spent a few days at the factory training installations and can tell ya, they are Wicked Good! and Worth Springing the Bucks for!

Get the Best. Get Hazelett.”

Capt Walt

“Thanks a million for saving my boat! The people on shore during George’s attack agreed that the Hazelett mooring pennant held Gaviota while other smaller and lighter boats dragged the moorings (and anchors) until they hit the rocks and the fuel docks, where they were destroyed. One 40′ boat moored to a block 1m3 and two screws beached in the mangroves.

This is a remarkable test when you consider that Gaviota is heavy (54,000lb) and 14′ beam, and that the winds were at least 110mph. But the real stress came from the surge and waves. They tell me that the boats were pitching 30 degrees or more.”

Fritz

“As a commercial spear fisherman, I need to know that my boat will remain on its mooring through a nasty blow and be ready for a day’s work. Since I’ve been using your rode, my anchorage has been hit by several fronts blowing in excess of 40 knots for four days straight, and one that came through at over 60 knots.

While many boats were dragging their moorings, chaffing through pennant lines, and yawing about, my 45-footer rode out the storms easily, with no problems. I noticed that there is less strain on my mooring, lines, and boat since I purchased your rode, and I would recommend it to anyone, especially liveaboards.”

Lee Starling, Commercial Fisherman, Key West, FL

SERVICES

Dubai showing docks

Installation Support Services

At Hazelett Marine Services, our commitment to client satisfaction extends beyond the conceptualization of mooring solutions – we are equally dedicated to providing comprehensive support throughout the installation process. Recognizing the value of strong customer relationships, we prioritize delivering the best service possible to ensure the success and longevity of your maritime projects. Understanding the critical role installation plays in the functionality of mooring systems, Hazelett takes a proactive approach. We not only recommend but can also provide professional, certified, and experienced installers to be on-site during the installation process. This strategic involvement ensures that the installation aligns seamlessly with the design specifications, guaranteeing the structural integrity and reliability of the mooring system(s).Our experienced installers bring a wealth of knowledge to the site, ensuring that every aspect of the installation is conducted with precision and expertise. Whether conducting the installation or supervising the process, Hazelett installers offer valuable insights, feedback, and necessary information to the onsite team.

Design & Engineering

From large Marina’s, docks, floating solar array’s, aquaculture, tidal generators, swing moorings and beyond – Hazelett Marine provides cutting edge design and engineering to ensure the best anchoring and mooring design for your project. Whether you need an elastic system, chain, cable and winch or a hybrid of multiple systems, we are here to help!

Installation, Inspection & Maintenance

Hazelett Marine will handle installation of anchors, mooring lines, and installation support worldwide. Our team of divers and certified installers will ensure installation runs smoothly, efficiently, and safely. We also provide inspection and maintenance services.

Project Management

Hazelett Marine will manage all aspects of a project – from design & engineering, sourcing, logistics, installation, and onsite support.